Hong Kong, 24th October, 1901.
I have the honour to report that Messrs Denison and Ram have now, in accordance with request, submitted a complete estimate of the cost of the new Kowloon Waterworks Gravitation scheme.
In forwarding to you their letter of the 14th instant, which contains the estimate referred to, I desire to point out the following essential points of difference between the scheme now proposed and that contained in Mr Gibbs's original Report of January, 1901.
(i). The dam is of masonry and concrete as recommended by Mr Chadwick, instead of an earthen bank.
(ii). The clay puddle core has been omitted, it being now proposed by Mr Binnie to treat the bed 30 feet lower in level.
The Colonial Secretary.
1:026
mal Passer
21/190.)
Sir
C.O
42624 471
RECO
(REGO 4 JEJ OL
Sublic Work's Office,
Hong Kong, 24th October, 1901.
I have the honour to report that Mess Denison and ham. have now, in accordance with extcurate of the cost
request, subonitter
a
cocceplete
of the new How
-lover Waterworks Gravitation scheme.
In forwarding
"the 14th
letter of the
to you
their
bustacet, which. contains the extincate referred to, I desire to poiect out the follow between the schemce now proposed ing essential points of difference and that contained in M. Gibbs's original Report of the one
January, 190). The dace is of masoury and
(i).
nement concrete as recom-
mended by Mr Chadwick, instead f'an earthen bacch (ii). The lay puddle core.
been rite has
proposed by M. Brandy being now treated 30 feet lower in level in the bed
altered as
to Conourable,